Quality & Logistics Standard Operating Procedure

Handling, Storage, Packing & Delivery Flow Chart

A rigorous 16-step standard operating procedure governing elastomeric bridge bearings across their entire supply chain lifecycle: from post-production handling, preliminary inspection, climate-controlled storage, to order verification, protective packaging, live-tracked transit, on-site customer inspection, and lifetime after-sales support.

Bridge Bearing Installation & Storage SOP - Polymer Products
Technical Manual

Storage, Handling & Installation

Proper storage, careful handling and correct installation are essential to maintain the condition and performance of Elastomeric Bearings.

The guidelines below cover the recommended practices for storing, handling, transporting and installing the bearings as specified for the product.

Pedestal Leveling
Leveling tolerance within ±1mm with non-shrink epoxy bedding mortar.
Synchronized Jacking
Even girder load transfer preventing edge crushing and eccentric rotation.
Annual In-Service Inspection
Checklist for elastomer shear strain, bulging, weathering, and grease condition.
Authority Approval
Standard methodology accepted across NHAI, Rail, Metro, and State PWD projects.
Complete Process Flow Chart

Handling, Storage, Packing & Delivery Flow Chart

Every stage from post-vulcanization handling to site acceptance adheres strictly to ISO 9001:2027 and IRC:83 (Part II) standards for complete material traceability and zero-defect transit.

6-Phase Lifecycle Overview
16 Step-by-Step SOP Protocols
Phase 1
Post-Production & Sorting
Steps 1 - 3
Phase 2
Storage & Inventory
Step 4 (A & B)
Phase 3
Picking & Final QC
Steps 5 - 7
Phase 4
Packing & Docs
Steps 8 - 10
Phase 5
Transit & Tracking
Steps 11 - 13
Phase 6
Receiving & After-Sales
Steps 14 - 16
01
Phase 1 • Post-Production

Post-Production Handling

Careful de-moulding and safe transfer immediately after hydraulic vulcanization under temperature-controlled cooling protocols to avoid thermal distortion and mechanical stress.

Key SOP Protocols:
  • Controlled cooling in gradual curing transition bay.
  • Pneumatic deflashing & flash trimming without scoring outer elastomer.
  • Handling with cushioned soft-padded carts to prevent edge impact.
Finishing Shopfloor
02
Phase 1 • Post-Production

Inspection

In-line verification of cured bearings for dimensional compliance, surface finish, Shore-A hardness, and structural bonding before moving to inventory.

Key SOP Protocols:
  • Durometer hardness check (60 ± 5 Shore A / IRHD per IS:3400).
  • Digital vernier validation of plan length, width, and total bearing height.
  • Visual check for zero blistering, foreign voids, or steel edge exposure.
QA In-Process Team
03
Phase 1 • Post-Production

Sorting

Bearings are organized by project specifications, bridge pier design load, customer purchase orders, and distinct manufacturer heat/cure batch numbers.

Key SOP Protocols:
  • Indelible side stamping (Manufacturer, Size, Lot No., Standard Code).
  • Project grouping (NHAI, Rail/Metro, State PWD, Overseas export).
  • ERP digital barcode label generation for live stock allocation.
Warehouse Marshalling
04
Phase 2 • Storage & Inventory

Storage

Dual-control management ensuring ambient environmental preservation of elastomers and digital real-time tracking of finished stock.

Storage Conditions (Temp., Humidity, UV Protection):

Store <40°C, protected from direct UV/sunlight, rain, ozone equipment, oils, acids, and solvents. Stored flat on wooden pallets.

Inventory Management (Tracking):

Real-time ERP barcoding, bin location mapping, FIFO dispatch scheduling, and 100% batch traceability.

Central Warehouse
05
Phase 3 • Picking & Final QC

Order Picking

Automated generation of Pick-Lists synced with client delivery schedules, retrieving exact pallet lots from rack bays using certified material handling equipment.

Key SOP Protocols:
  • Automated ERP Pick-Slip authorization against approved sales orders.
  • Pallet retrieval with soft webbing slings or rubber-guarded forklift tines.
  • Pre-staging in temperature-controlled pre-dispatch marshalling bay.
Dispatch Handling Desk
06
Phase 3 • Picking & Final QC

Verification of Order

Dual-stage audit reconciling picked physical bearings against client purchase orders, approved structural drawings, and pier load schedules.

Key SOP Protocols:
  • Verification of plan dimensions, internal laminate layers, and rubber grade.
  • Cross-referencing client drawing revision and consultant approval stamp.
  • Quantity tally & spares count reconciliation.
Order Management Team
07
Phase 3 • Picking & Final QC

Quality Check (Final)

100% pre-dispatch quality verification by certified QA inspectors and third-party inspection (TPI) agencies to guarantee zero field failure.

Key SOP Protocols:
  • Proof load verification test (1.5x vertical load test report verification).
  • 100% visual inspection of side rubber coverage (≥4mm) & top covers.
  • Formal QA Dispatch Clearance sign-off and QC green-tagging.
QA/QC & TPI Inspection Bay
08
Phase 4 • Packing & Docs

Packing

Robust multi-layer protective packaging engineered to safeguard bearings against weather, moisture, puncture, and transit vibration.

Key SOP Protocols:
  • Heavy-gauge (≥250 micron) UV-treated polyethylene shrink film wrapping.
  • Heavy-duty corner edge protectors and cushioning spacers.
  • ISPM-15 treated wooden pallets with high-tensile polyester strapping.
Packaging Line
09
Phase 4 • Packing & Docs

Documentation & Shipment Preparation

Compilation and secure attachment of all statutory, engineering, and quality documentation enclosed in waterproof consignment pouches.

Key SOP Protocols:
  • Manufacturer Test Certificate (MTC per EN 10204 3.1) & Lab Test Reports.
  • Delivery Challan, Tax Invoice, Transit Insurance & GST E-Way Bill.
  • IRC:83 On-Site Installation SOP & Warranty Certificate enclosed.
Logistics Documentation Desk
10
Phase 4 • Packing & Docs

Loading of Shipment

Safe, balanced mechanical loading onto designated transport vehicles utilizing certified fabric webbing slings and crane/forklift protocols.

Key SOP Protocols:
  • Zero direct steel hook or wire rope contact on elastomer surfaces.
  • Axle weight balancing to prevent transit shifting and rollover hazard.
  • Heavy-duty ratchet tie-down lashing over corner load-distributors.
Factory Loading Bay
11
Phase 5 • Transit & Delivery

Transportation & Delivery

Safe road freight via covered, weatherproof containerized trucks and shock-insulated vehicles dispatched directly from Nashik facility to project sites.

Key SOP Protocols:
  • 100% waterproof tarpaulin or hard-container transit protection.
  • Anti-vibration pallet base dampeners for long-haul national transport.
  • Dedicated direct logistics avoiding intermediate transshipment hubs.
Fleet Logistics Division
12
Phase 5 • Transit & Delivery

Tracking (Shipment Monitoring)

24/7 telematics and GPS tracking providing transparent milestone alerts, route visibility, and accurate Estimated Time of Arrival (ETA) to the site team.

Key SOP Protocols:
  • Real-time GPS vehicle tracking with live geographical location link.
  • Proactive SMS & Email milestone notifications sent to project engineers.
  • Dedicated 24/7 logistics helpline for transit inquiries.
Supply Chain Telematics
13
Phase 5 • Transit & Delivery

Final Delivery to Customer

Safe vehicle arrival at the client's bridge construction site, highway casting yard, or precast yard with coordinated unloading supervision.

Key SOP Protocols:
  • Arrival reporting and gate clearance at site staging zone.
  • Unloading with crane spreader beams or site forklift on timber skids.
  • Physical count matching with driver delivery challan.
Client Site Staging Area
14
Phase 6 • Receiving & After-Sales

Receiving & Inspection by Customer

Joint on-site receipt inspection by client resident engineer, EPC contractor QA personnel, and consultant representatives against MTC parameters.

Key SOP Protocols:
  • Intact shrink-wrap seal and tamper-proof tag verification.
  • Bearing serial number matching against MTC and dispatch manifest.
  • Visual check for zero damage occurred during long-distance transit.
Client Site QA & Consultant
15
Phase 6 • Receiving & After-Sales

Receiving Confirmation

Formal client sign-off on the Goods Received Note (GRN) and Delivery Challan confirming acceptance of consignment and transfer of custody.

Key SOP Protocols:
  • Executed GRN endorsement with authorized site seal and sign.
  • Physical handover of official test certificate dossier & SOP booklet.
  • Digital logging into ERP for warranty activation.
Site In-Charge / PP Logistics
16
Phase 6 • Receiving & After-Sales

After-Sales Support (Returns/Claims)

Comprehensive technical engineering assistance during bridge installation, expedited claims/returns protocol, and lifetime product support.

Key SOP Protocols:
  • On-site / remote engineering guidance for pedestal mortar & jacking.
  • Rapid claims handling & prioritized replacement warranty in 48-72h.
  • Periodic post-installation health check advisory & lifetime records.
Technical Services Division
100% Quality & Transit Traceability Guarantee

Every single elastomeric bearing shipped from Polymer Products is backed by individual serial-number traceability, accredited raw material MTC test reports, and compliance with IRC:83 (Part II), RDSO, and ISO 9001:2027 standards.

Site Installation & Logistics Assistance

Need Assistance with Bearing Delivery or On-Site Handover?

Our technical engineers and logistics managers coordinate vehicle dispatch schedules, site unloading protocols, and MTC test documentation for smooth contractor handover.